The BRAT Beta Program

Started by Halfcrazy, August 15, 2014, 03:31:17 PM

Previous topic - Next topic

TomW

Quote from: Free Energy Freak on September 26, 2014, 07:45:02 PM
And those units will be dubbed, the "Ryan Beta Brats". :)

I am thinking "Ryan Alpha Brats" or RABs for short.

T

Do NOT mistake me for any kind of "expert".

( ͡° ͜ʖ ͡°)


24 Trina 310 watt modules, SMA SunnyBoy 7.7 KW Grid Tie inverter.

I thought that they were angels, but much to my surprise, We climbed aboard their starship and headed for the skies

Free Energy Freak

LOL. Agreed. A much better choice.
400 watts, MS ProStar 30m, 12vdc @ 240 AH - Internal lighting & 12v Shurflo pump at farm.
270 watts, Beta Kid, 12vdc @ 120AH - Back up internet, computer, during weekly power cuts.
100 watts, MS Sunlight 10a, 12vdc @ 50AH - Exterior LED perimeter lighting at farm.

dapdan

I'm ready...I'm ready...I'm ready

SpongeboB fans will understand.

Cheers...
Damani

Halfcrazy

#18
Quote from: dapdan on September 28, 2014, 06:06:58 AM
I'm ready...I'm ready...I'm ready

SpongeboB fans will understand.

Cheers...
Damani
Whooooo lives in a pineapple under the sea?
Changing the way wind turbines operate one smoke filled box at a time

dapdan

1/2,

lol. what RE folk find amusing.

Damani

Free Energy Freak

Quote from: dapdan on September 28, 2014, 07:06:09 AM
1/2,

lol. what RE folk find amusing.

Damani

It's too much sunlight to the brain.
Crazy guys think they are solar panels. :D
400 watts, MS ProStar 30m, 12vdc @ 240 AH - Internal lighting & 12v Shurflo pump at farm.
270 watts, Beta Kid, 12vdc @ 120AH - Back up internet, computer, during weekly power cuts.
100 watts, MS Sunlight 10a, 12vdc @ 50AH - Exterior LED perimeter lighting at farm.

CDN-VT

#21
I got a reply !
My testing will be over winter on a new mountain emergency cabin shelter.
Will see cuz Im setting to finish in November & with a Morning star . next year we will have 3 more  emergency cabin shelters coming. Done now & setup
VT
Canadian Solar 350W 37.6 VOC  30.6 VMP 8.22 ISC 7.87 IMP ,-15 c +30c max  4 strings in 2 in Series for 24v Classic 150 -1020 Ah  Freezers & fridges ~~~ Second Array same panels of 3sx3 parallel for 24 V Classic 150 -440 Ah Outback Barns & out blds.
48Vdc almost done,11Strings up of 3s11P same panels

Free Energy Freak

400 watts, MS ProStar 30m, 12vdc @ 240 AH - Internal lighting & 12v Shurflo pump at farm.
270 watts, Beta Kid, 12vdc @ 120AH - Back up internet, computer, during weekly power cuts.
100 watts, MS Sunlight 10a, 12vdc @ 50AH - Exterior LED perimeter lighting at farm.

dapdan

So...when are they sending out the brats then?

onanparts

Quote from: dapdan on October 11, 2014, 05:45:14 AM
So...when are they sending out the brats then?

I even planted a tree just to nail a BETA BRAT to but no reply from Raechel at Midnite.... :(
I got the deluxe kit, it had a solar cell and a meter.

Midnite B17-10. 50kW Cont. 150kW Surge... Me/Myself/And/I

dgd

Quote from: onanparts on October 11, 2014, 05:27:06 PM
Quote from: dapdan on October 11, 2014, 05:45:14 AM
So...when are they sending out the brats then?

I even planted a tree just to nail a BETA BRAT to but no reply from Raechel at Midnite.... :(

Oh ye of little faith  :o
So you expect the tree to grow to a brat-nailable-to size before the brat  becomes available  ???

dgd
Classic 250, 150,  20 140w, 6 250w PVs, 2Kw turbine, MN ac Clipper, Epanel/MNdc, Trace SW3024E (1997), Century 1050Ah 24V FLA (1999). Arduino power monitoring and web server.  Off grid since 4/2000
West Auckland, New Zealand

onanparts

Quote from: dgd on October 12, 2014, 01:31:14 AM
Quote from: onanparts on October 11, 2014, 05:27:06 PM
Quote from: dapdan on October 11, 2014, 05:45:14 AM
So...when are they sending out the brats then?

I even planted a tree just to nail a BETA BRAT to but no reply from Raechel at Midnite.... :(

Oh ye of little faith  :o
So you expect the tree to grow to a brat-nailable-to size before the brat  becomes available  ???

dgd

Planted early morning on Aug 17th. Been watered and looked after very carefully since then. A small finishing nail "might" work but most likely a staple would be more appropriate at this stage.... :)

Beta KID #17 has been waiting patiently for a little Beta BRAT to annoy.  ;D
I got the deluxe kit, it had a solar cell and a meter.

Midnite B17-10. 50kW Cont. 150kW Surge... Me/Myself/And/I

CDN-VT

Gentle Folks , I only received a reply . Im still waiting also.
Tomorrow I fly back into Arlington for a week , then back. November Im house sitting 3 houses .

VT 
Canadian Solar 350W 37.6 VOC  30.6 VMP 8.22 ISC 7.87 IMP ,-15 c +30c max  4 strings in 2 in Series for 24v Classic 150 -1020 Ah  Freezers & fridges ~~~ Second Array same panels of 3sx3 parallel for 24 V Classic 150 -440 Ah Outback Barns & out blds.
48Vdc almost done,11Strings up of 3s11P same panels

BobWhite

Quote from: Halfcrazy on September 26, 2014, 05:20:05 PM
There are a few Brat's going out today to Myself and a few employees. If all goes well we should start shipping Beta units in a few weeks. Stay tuned.


Has anyone heard how Ryan is doing with his, maybe he can let us know.
Walt.
12-Lifeline AGM 8D's
10-Lifeline AGM GPL 31T
16- Diehard GC2
4-Classic 3-150 and 1-200
1-Classic Lite
2-BRATS
5wiz bang Jrs, , 2- Samlex-24Volt
5- 235 MX60s
10- Sharp 198
10 Solar world 345 XL Mono

dapdan

Anyone,

Has there been any new development with respect to the brat charge controllers.

Cheers...
Damani