Author Topic: New Off Grid Inverter Charger  (Read 112027 times)

onanparts

  • Hero Member
  • *****
  • Posts: 612
    • onanparts.com
Re: New Off Grid Inverter Charger
« Reply #615 on: November 18, 2018, 11:03:34 PM »
Robin, about that spaceship........

I got the deluxe kit, it had a solar cell and a meter.

Midnite B17-10 20kW

Robin

  • Hero Member
  • *****
  • Posts: 550
Re: New Off Grid Inverter Charger
« Reply #616 on: November 19, 2018, 12:43:12 AM »
You forgot BobQ and Sami.
Linnea is our engineering assembler.
Ryan and Roy serve a very important function keeping the engineers going down the right path also.
We have a huge engineering staff compared to our competition. They can much better afford engineers, but they just don't do it?
Robin Gudgel

Robin

  • Hero Member
  • *****
  • Posts: 550
Re: New Off Grid Inverter Charger
« Reply #617 on: November 19, 2018, 12:49:13 AM »
I have always wanted to design and build stuff. I remember in the 7th grade searching for a couple of 55 gallon drums so I could build a submarine. The rocket ship is no different.
Robin Gudgel

russ_drinkwater

  • Hero Member
  • *****
  • Posts: 533
  • Power companies pay me for power!
Re: New Off Grid Inverter Charger
« Reply #618 on: September 13, 2019, 06:28:11 AM »
Has the B17 reached production or stalled in development?
Standalone. 20 Hyundai x 220 watts panels, 2 x classic 150's, Latronics 24 volt 3kw inverter, Whiz bang Jnr, 12 Rolls surrete  4KS 25P  batteries and WBJ.
Grid tie feed-in, 12.5 kw in 3 arrays generating 50 kws per day average. Solar river grid tie inverters

Westbranch

  • Hero Member
  • *****
  • Posts: 2775
  • Building System (sort of) 1 weekend at a time
Re: New Off Grid Inverter Charger
« Reply #619 on: September 13, 2019, 11:56:16 AM »
boB made a comment about the B17 (?) in the thread about the smaller inverters
KID FW1811 560W >C&D 24V 900Ah AGM
CL150 29032 FW V.2126-NW2097-GP2133 175A E-Panel WBjr, 3Px4s 140W > 24V 900Ah AGM,
2 Cisco WRT54GL i/c DD-WRT Rtr, NetGr DS104Hub
Cotek ST1500 Inv  want a 24V  ROSIE Inverter
OmniCharge3024  Eu1/2/3000iGens
West Chilcotin 1680+W to come

boB

  • Global Moderator
  • Hero Member
  • *****
  • Posts: 3264
Re: New Off Grid Inverter Charger
« Reply #620 on: September 14, 2019, 01:41:08 AM »
No development stalled.  Well under way and busy every day.

It is just taking much longer than expected or wanted !

K7IQ

russ_drinkwater

  • Hero Member
  • *****
  • Posts: 533
  • Power companies pay me for power!
Re: New Off Grid Inverter Charger
« Reply #621 on: January 22, 2020, 03:33:57 PM »
Any update on the B17 Bob?
Standalone. 20 Hyundai x 220 watts panels, 2 x classic 150's, Latronics 24 volt 3kw inverter, Whiz bang Jnr, 12 Rolls surrete  4KS 25P  batteries and WBJ.
Grid tie feed-in, 12.5 kw in 3 arrays generating 50 kws per day average. Solar river grid tie inverters

boB

  • Global Moderator
  • Hero Member
  • *****
  • Posts: 3264
Re: New Off Grid Inverter Charger
« Reply #622 on: January 22, 2020, 05:49:24 PM »
Any update on the B17 Bob?

No, sorry.  Still working on it.   A  LOT of us are working on it !

boB
K7IQ

russ_drinkwater

  • Hero Member
  • *****
  • Posts: 533
  • Power companies pay me for power!
Re: New Off Grid Inverter Charger
« Reply #623 on: January 24, 2020, 08:32:57 PM »
Sounds like my new cattle yards, but its a solo mia inillud operatur my case!
Standalone. 20 Hyundai x 220 watts panels, 2 x classic 150's, Latronics 24 volt 3kw inverter, Whiz bang Jnr, 12 Rolls surrete  4KS 25P  batteries and WBJ.
Grid tie feed-in, 12.5 kw in 3 arrays generating 50 kws per day average. Solar river grid tie inverters

Highflyer

  • Full Member
  • ***
  • Posts: 168
Re: New Off Grid Inverter Charger
« Reply #624 on: June 18, 2020, 12:28:03 PM »
Any chance for a six month checkup?  How is Rosie and the rest doing?
Brian

The one thing is the one thing

FNG

  • Administrator
  • Sr. Member
  • *****
  • Posts: 260
Re: New Off Grid Inverter Charger
« Reply #625 on: June 18, 2020, 03:42:17 PM »
Still a good bit to go,
The B17 is making ac but is not charing the batteries yet. boB is working on that still, I suspect 2-3 months for off site alpha testing.
Rosie, This was given to Andy and he is working on it daily but it is probably a bit further out say 3-5 months for off site alpha testing.
Barcelona and Hawkes bay are both under the guidance of Mario and I would say are 2-3 months from off site alpha testing
The Comm Box, This one I am not sure I am guessing it is about inline with the Rosie
MNGP2 is taking shape, we (All of us) are working on menus and layout now