A Forum run by Enthusiasts of MidNite Solar

General Category => New Product Ideas and Discussion => Topic started by: poil de coyotte on August 26, 2015, 06:03:04 AM

Title: Schneider Context XW+ and Classic
Post by: poil de coyotte on August 26, 2015, 06:03:04 AM
Hello,

I would like to know,  if in the future, it will be possible to synchronize the battery charging between a Schneider Xantrex Conext XW+ inverter/charger and a Midnite Classic, as it is possible for a Sunny Island SMA?

I changed the Sunny Island 5048 for Schneider, too many problems with Sma >:( , but I continue to operate in AC bus,  I have a 1 kilowatt Kestrel wind turbine, I would like to add in a 48V bus, but by synchronizing the charging phases.

Thanks

Poil de coyotte - Azores Islands

Schneider Conext SW+ 8548 / Rolls 5000 960Ah / 3.5 kw pv amorphous 6.4 kw poly / 3x Sunny Boy SMA / Bornay 1.5kw Wind turbine /...(or  kestrel 1 kw)

Title: Re: Schneider Context XW+ and Classic
Post by: Halfcrazy on August 27, 2015, 03:43:44 PM
Yes. Schneider has released the protocol to us and we have just put an engineer on the project. Stay tuned
Title: Re: Schneider Context XW+ and Classic
Post by: mike90045 on August 28, 2015, 01:29:40 AM
I would not complain if there was something coming along like the Conext Combox.  Mine had a fatal internal memory full error.  Did lots of nice stuff while it worked.
Title: Re: Schneider Context XW+ and Classic
Post by: poil de coyotte on August 28, 2015, 04:36:23 PM
Thank you for your answer !

Great !  :D :D :D
Title: Re: Schneider Context XW+ and Classic
Post by: Robin on January 30, 2016, 12:16:53 PM
The engineer that created the sma adapter ispresently working on the first of two inverters assigned to him so we had to put the comm adapter on the back burner. We have 14 people in the engineering department. Twelve of them are focused on various inverter designs. There are many different inverters in the worls. Fun stuff even of we are a bit late coming to the party


.