MidNite Breakers in OB Load Center

Started by LostLoon, March 22, 2012, 01:45:10 PM

Previous topic - Next topic

LostLoon

I have always used MidNite E-Panels over the OutBack distribution gear. I have a job coming up for dual OutBack Radians and it looks like it will happen before MidNite gets the Radian E-Panel out the door. In terms of breakers (both dinrail and panel mount) is there difference between the OutBack and the MidNite? Will I run into any problems using MidNite breakers in the OutBack load center?

My guess is that the breakers are identical in everything but who puts their sticker on it, but I just wanted to check, as I have only ever bought and used MidNite!

Halfcrazy

As long as they are the same (IE din rail mount, or 3/4 inch panel Mount) than there should be no problem. I do think our Radian E panel is real close I need to get an update from Engineering on this.


Ryan