Classic 250 maximum input?

Started by Mechanicalbird, July 15, 2015, 02:15:47 PM

Previous topic - Next topic

Mechanicalbird

Right now my Classic 250 has 1800w PV @ 215v coming in. I am just wondering how much more PV wattage I can add on a single classic. What is the maximum input to the classic 250?

I'm asking because id eventually like to add another 1800w if possible so I can run heavy loads while still getting a full charge.

Vic

Hi M b,

Have you tried this Classic  String Sizing Tool?:
http://www.midnitesolar.com/sizingTool/displaySizing.php

Also,  look at this Classic Power Chart,  from that,  it looks like doubling the 1800 W array would be quite a bit too much for the Classic 250:
http://www.midnitesolar.com/images/classicFrontPage/graphs.php

Was not certain just what was the "215 V coming in" might be.    Is that the String STC Vmp,  or,  just what?

FWIW,  Vic
Off Grid - Sys 1: 2ea SW+ 5548, Surrette 4KS25 1280 AH, 5.25 KW PV, Classic 150,WB, Beta Barcelona, Beta KID
Sys 2: SW+ 5548s, 4KS25s, 5.88 KW PV, 2 ea. Classic 150, WB, HB CC-needs remote Monitoring/Control, site=remote.
 MN Bkrs/Bxs/Combiners. Thanks MN for Great Products/Svc/Support&This Forum!!

Mechanicalbird

Thanks Vic.

Sorry. The 215v is string voltage into the Classic.

Mechanicalbird

Thanks for the link to the calculator. Looks like I'm right at the limit now with 1 controller.

What's involved with adding a second controller? Can you have 2 controllers to the same battery bank?

Westbranch

Anther Classic can be put into FOLLOW ME mode and they will be happy to work together... :D
KID FW1811 560W >C&D 24V 900Ah AGM
CL150 29032 FW V.2126-NW2097-GP2133 175A E-Panel WBjr, 3Px4s 140W > 24V 900Ah AGM,
2 Cisco WRT54GL i/c DD-WRT Rtr, NetGr DS104Hub
Cotek ST1500 Inv  want a 24V  ROSIE Inverter
OmniCharge3024  Eu1/2/3000iGens
West Chilcotin 1680+W to come

Vic

Hi M b,

YES,  you can use two or more CCs on a single battery bank,  each with its own separate PV array.

And since they would be MN Classics,  you can use 'Follow Me' so that each can coordinate charge stages.   'Tis very cool.

No problem on the 215 V,  just was not certain if that was the STC String Vmp, observed Vin,   etc.

Good Luck,   Vic
Off Grid - Sys 1: 2ea SW+ 5548, Surrette 4KS25 1280 AH, 5.25 KW PV, Classic 150,WB, Beta Barcelona, Beta KID
Sys 2: SW+ 5548s, 4KS25s, 5.88 KW PV, 2 ea. Classic 150, WB, HB CC-needs remote Monitoring/Control, site=remote.
 MN Bkrs/Bxs/Combiners. Thanks MN for Great Products/Svc/Support&This Forum!!