Hi Guys

Have got all the 10 new panels up took forever on 40 c Heat, I intend to set the panels in parallel if I worked the string sizing tool correctly see attached result I have also attached the spec sheet of the panels which are the C2 Type.

The next step is wiring it in where I will be using inline Fuses and MC 4 connectors and decent 6mm UV resistant coated wiring which will also be in conduit.

A question I have is the Dodgy Guy used 240 AC wiring from the solar panels to the MPPT and Batteries would it be better If replaced it with good DC wiring