Quote from: ClassicCrazy on August 12, 2018, 10:05:26 AM
You might have to cycle those new batteries deep (  50% ?)  a couple times before they start acting properly like you would expect a deep cycle battery to.

Larry
From the Trojan Industrial Line User's Guide: "Trojan batteries take 50 - 100 cycles to work up to providing full amp-hour capacity."
Offgrid since 2001.
4800W PV to 2 Midnight Classic 200 CCs. -- FLA with ~40 kWh @ 48V. -- MagnaSine 4448 split phase inverter on a Midnight e-panel. -- Birdhouse,WBjr, etc. -- Two more strings for 18A @ 121VDC to water heater.

ClassicCrazy

Quote from: Vic on August 12, 2018, 03:31:26 PM
Quote from: ClassicCrazy on August 11, 2018, 09:11:02 PM
There is a lot of info on how to hook up and test the stuff on the knowledge base ( I only found out about this recently)
http://www.midniteftp.com/support/kb/index.php
Larry

Hi Larry,

Thanks for reminding me of the Knowledge Base   ...   this is a great addition to the Forum.

73,   Vic

Yeah I like it ! Saves us a lot of explaining doesn't it !

Larry
system 1
Classic 150 , 5s3p  Kyocera 135watt , 12s Soneil 2v 540amp lead crystal 24v pack , Outback 3524 inverter
 5s 135w Kyocero , 3s3p 270w Kyocera   Classic 150 ,8s2p  Kyocera 225w to Hawkes Bay Jakiper 48v 20kwh  ,Gobel 16 kwh  lifepo4 Outback VFX 3648  8s2p 380w Rec pv EG4 6000XP

Vic

Hi DEinME,

Am curious how those new Trojan IND batteries are doing.

Are  you able to achieve full-charge,  measured SGs,   using the standard Absorb voltage?

Any other observations on these batteries?

Thanks,   Vic
Off Grid - Sys 1: 2ea SW+ 5548, Surrette 4KS25 1280 AH, 5.25 KW PV, Classic 150,WB, Beta Barcelona, Beta KID
Sys 2: SW+ 5548s, 4KS25s, 5.88 KW PV, 2 ea. Classic 150, WB, HB CC-needs remote Monitoring/Control, site=remote.
 MN Bkrs/Bxs/Combiners. Thanks MN for Great Products/Svc/Support&This Forum!!